9th WCEAM Research Papers Volume 1 Proceedings of 2014 World Congress on Engineering Asset Management

Engineering asset management encompasses all types of engineered assets including built environment, infrastructure, plant, equipment, hardware systems and components. Following the release of ISO 5500x set of standards, the 9th WCEAM addresses the hugely important issue of what constitutes the body...

Descripción completa

Detalles Bibliográficos
Autor Corporativo: SpringerLink (-)
Otros Autores: Amadi-Echendu, Joe (-), Hoohlo, Changela, Mathew, Joe
Formato: Libro electrónico
Idioma:Inglés
Publicado: Cham : Springer International Publishing 2015.
Colección:Lecture Notes in Mechanical Engineering.
Springer eBooks.
Acceso en línea:Conectar con la versión electrónica
Ver en Universidad de Navarra:https://innopac.unav.es/record=b33028928*spi
Tabla de Contenidos:
  • Supply Market Risk Management in the Context of Engineering Asset Management Management
  • Application of a performance - driven TCO evaluation model for physical asset management
  • Government Entity Contribution to an Effective Partnership Privatisation
  • Implications of Cadastral Systems on Engineering Asset Management
  • A Decision Support Framework for Prioritization of Engineering Asset Management Activities under Uncertainty
  • Planning Rehabilitation Strategy of Sewer Asset using Fast Messy Genetic Algorithm
  • Methods and tools for sustainable manufacturing networks – results of a case study
  • A Modeling Approach for Infrastructure Evaluation from Customers' Viewpoints: Using Sewer Systems as a case study
  • The Interface Challenge in Risk-based Asset Management
  • Lean Approaches in Asset Management within the Mining Industry
  • Integrating Tacit Knowledge for Condition Assessment of Continuous Mining Machines
  • Extraction of Principal Components from Multiple Statistical Features for Slurry Pump Performance Degradation Assessment
  • Fault Detection of Wind Turbine Drivetrain Utilizing Power-Speed Characteristics
  • Maintenance Method based on Risk Estimation for 170kV Pneumatic Type Gas Insulated Switchgear.